Grid Signal gives battery storage developers a fast, first-pass read on connection viability. Focus your feasibility budget on sites that can connect.
Battery storage development depends on available headroom and queue position. A site that looks perfect can face connection delays beyond 2030. Upgrades can change project economics late in the process.
Grid Signal provides a screening signal to rank your pipeline. We check substation capacity and queue density. You get a rapid read before you commit land capital or DNO fees.
For battery storage, queue position and reinforcement exposure are the most important variables. Two sites in the same DNO region can have wildly different connection windows depending on local network conditions and what is sitting ahead of them in the queue.
Grid Signal provides structured intelligence on queue dynamics, headroom availability, and constraint exposure so developers and investors can rank sites by real connection viability rather than informal feedback.
Understand where your project sits relative to others in the same constraint zone, including TM04+ priority indicators and likely energisation windows.
Live constraint and curtailment indicators at the substation level, with reinforcement schedule overlay and ESO commercial signal context.
Locational charge exposure across the UK transmission zones, with context on Balancing Mechanism and Capacity Market signals relevant to your site.
Apply a consistent index across every candidate site so capital allocation reflects connection reality, not the loudest internal advocate.
Screen candidate storage sites before option agreements or land deposits. The Site Intelligence Report returns a Grid Signal Index for any UK postcode within one working day, with headroom, queue density, and reinforcement exposure indicators. Ordered directly online, no call required.
Screen a site arrow_forwardCapacity and duration shape your connection profile and the markets your battery can earn from. Location and operating year shape how much. This is a directional view of where your project sits. A formal briefing walks through the inputs that move the numbers most.
TNUoS zone shapes generation/demand tariff exposure
A 2-hour battery system in 2025 sits at the UK mainstream and balances wholesale arbitrage, BM access and ancillary services. Capacity Market access is partial and depends on duration de-rating.
This is a directional revenue map, not a financial model. Real revenues depend on dispatch optimisation, ancillary saturation, CM clearing, BM access and TNUoS treatment specific to your site. A briefing walks through the inputs that move the numbers most.
Get an instant viability read in the Grid Signal screening tool.
Two tiers of energy infrastructure screening and modelling, scoped to your project stage.
Rapid pre-feasibility check for any UK storage site, delivered online. Get available headroom, queue density, and a 0-100 Grid Signal Index score to quickly filter out constrained locations.
High-fidelity grid simulation and economic analysis for sites that pass the screen. Includes TeraJoule market modelling and board-ready feasibility reviews for capital allocation decisions.
The Grid Signal Index is a screening signal, never a precision or capacity guarantee.